Skip to content

asbestossurveysouthlondon.co.uk

Asbestos found in good condition: why leaving it is often the safest option

Finding asbestos is often less dramatic than people expect. Material in good condition that will not be disturbed is usually left in place, labelled and checked.

The three routes

  • Leave it and manage it. Good condition and not in the way of any work. Record it, do not drill or sand it, and check it again later.
  • Repair or seal it. Minor damage. Seal or enclose it so fibres cannot be released, or replace it when that part is next renewed.
  • Remove it before work. In the way of planned work, or badly damaged. Higher-risk materials such as insulating board need a licensed contractor.

How the decision is made

Each item gets a material score using HSE's assessment in HSG264: four factors scored and added up. Ten or more is high, 7 to 9 medium, 5 to 6 low and 4 or less very low. The score, the item's condition and any planned work together decide the route.

We survey; we do not sell removal on the day. If you are offered removal straight away, ask why it cannot be managed instead.

Need an asbestos survey for this building?

From £300 with one sample, £50 for each extra. Fixed in writing before we book.

Keep reading

Line drawing of two floor plans, one lightly sampled and one opened up for works

Management survey or refurbishment survey: which do you need?

One is for a building in normal use, the other for the rooms you're about to work on. Here's how to...

Read more
Line drawing of sealed sample bags in a row

How many samples will my asbestos survey need?

Every survey starts at £300 with one sample analysed. Here is how we work out whether you need more, and what...

Read more